Lots are filling up quickly in Pheasant Crossing, shown in the foreground. Construction started in the fall of 2025.
The first houses in the Misty Valley subdivision, located behind Pheasant Crossing, were constructed in 2009. By 2017, the development was full.
In the distance to the right is the entrance to Redtail Ridge, where construction began in 2024.
With Lake Mendota to the east, Madison to the south, and a greenspace bordering the Town of Middleton to the west, Middleton has only one direction in which to expand. Its other option is infill, which is taking place along its major thoroughfares: University Avenue, Allen Boulevard, Century Avenue, and Parmenter Street.
Pheasant Crossing posts:
2026
2026
July construction site visit. (7/19)
March construction site visit. (3/25)
2025
October construction site visit. (10/19)
July construction site visit. (7/13)
Ziegler Farm neighborhood proposal, Middleton WI (June 2025 construction site visit). (5/5)
Redtail Ridge posts:
2026
Redtail Ridge neighborhood. (7/19)
Redtail Ridge neighborhood. (4/21)
Redtail Ridge apartments. (2/2)
July-December 2025
Redtail Ridge apartments. (11/19)
Cruising Redtail Ridge. (11/19)
Cruising Redtail Ridge. (10/19)
Redtail Ridge apartments. (10/5)
Cruising Redtail Ridge. (9/15)
Redtail Ridge apartments. (9/14)
Cruising Redtail Ridge. (8/8)
Redtail Ridge neighborhood. (7/13)
January-June 2025
Redtail Ridge neighborhood. (6/12)
Redtail Ridge apartments. (5/10)
Cruising Redtail Ridge. (3/28)
Cruising Redtail Ridge. (3/3)
Cruising past Redtail Ridge. (2/9)
Cruising Redtail Ridge. (2/7)
Cruising past Redtail Ridge. (1/25)
Redtail Ridge apartments. (1/25)
July-December 2024
October construction site visit. (10/21)
Redtail Ridge apartments. (10/21)
September 2024 site visit. (9/12)
August 2024 site visit. (9/3)
January-June 2024
June 2024 site visit. (6/29)
April 2024 site visit. (4/11)
March 2024 site visit. (3/6)
2023
2017