Skeleton of Tappan Zee Bridge's Successor Begins to Surface in the Hudson. (The New York Times, 9/18/2014)
Taking shape.
The Erector Set-like skeleton of the first of 86 pairs of columns that will support the twin-spanned bridge rises 40 feet in the air near the Westchester side, waiting to be entombed in concrete that will be poured from an inventive floating concrete plant.The New NY Bridge
Construction cameras
Replacing....
Other Road Work posts:
Verona Road interchange. (9/15/2014)
Animated flyover of Zoo Interchange. (9/13/2014)
Take a trip across the new St. Croix River Bridge. (9/13/2014)
No comments:
Post a Comment