Thursday, July 25, 2024

Proposed courtyard improvements at Middleton Glen in Middleton Wisconsin

 

Google Maps

Renderings:  Middleton Plan Commission



DESCRIPTION OF PROPOSED IMPROVEMENTS 
JSD Professional Services, Inc. and The Bruce Company have consulted with Middleton Glen to provide design services for this courtyard improvements project which includes a new concrete patio and shelter structure supported by limestone retaining walls. Surrounding the new seating space includes a pondless water fountain, dry creek bed, and a bio-retention basin. Opportunities to enjoy sun, shade, and numerous natural planting areas have been provided while properly accounting for the sites grading and drainage components. The dry creek bed will not only provide a path for drainage collected from the building’s rooftops and new patio surfaces, but also create a natural buffer to the neighboring residential property to the south. The bioretention basin terminates the dry creek bed while buffering the patio from Old Creek Road, creating a private patio surrounded by many elements of nature. The ADA accessible patio can be accessed by ramp or stairs and offers a good vantage point of the surrounding space. The patio will be used casually by residents and visitors between 10:00 a.m. and 7:00 p.m.. The space can accommodate larger groups when needed but will likely be utilized by small groups day to day.

No comments:

Post a Comment