Thursday, January 31, 2019

The only building on the Foxconn campus is as much a research center as the City of Middleton's operations center


Screenshot from drone video that accompanies online J-S article

Foxconn may drop manufacturing as part of drastic rethinking of Racine County campus.  (Milwaukee Journal Sentinel, 1/30/2019)

The award-winning building pictured below is the Middleton Operations Center, an 88,000-square-foot facility shared by the Public Works and Public Lands departments.  A portion of a 22,000-square-foot cold storage facility is seen in the lower-right corner.

Photo credit:  MG&E

Related post:
Foxconn be nimble, Foxconn be quick, Foxconn jump over the manufacturing stick.  (1/30/2019)

No comments:

Post a Comment